This is done in multiple lifts of around 4 feet or less.
Pouring concrete walls in lifts.
The layer thickness ranges from 300mm to 500mm and the time between successive layers should not exceed 30 minutes for normal weather condition and 20 minutes for hot weather condition.
Place concrete walls with a maximum 60cm layer in one pass to avoid segregation.
If the full hydrostatic pressure assumption was imposed the lift height would be limited to 11 feet requiring more than three separate concrete placements.
Make multiple passes if needed to create a flat evenly filled area.
Reduce cold joints honeycombing and bugholes by training workers how to place and vibrate concrete in walls.
The basic principles of placement and vibration are the same for any placing equipment used.
Drag a straight 2x4 screed board across the top of the concrete forms to level the concrete.
See below for more information on contraction joints remove forms and install waterproofing and drainage system.
This placement method is a standard practice in the icf industry.
If problems occur however corrective action can minimize their recurrence.
How to pour concrete in columns and walls.
The 4 foot lift height is a recommendation as a guideline to.
Pouring of concrete in columns and walls if the height of these elements is large then it is recommended to place concrete in layers.
In commercial construction walls may be higher 14 to 18 feet.
Pour and level the concrete.
The pressure in the icf forms is based on how high the concrete is poured at once.
Create contraction joints every 4 6 feet.
These walls also have the concrete placement in multiple lifts following the same procedure.
Wall to a maximum of 10 to 12 feet in height during one concrete pour.
By pouring in lifts the first part of the concrete starts to set up slightly slake reducing pressure on the lower forms.
If too much concrete is poured in one place at one time the pressure build up could become too much for the icfs to handle.
In this project 40 foot concrete walls were poured using formwork rated at 1650 psf.
Place concrete at or close to its final position.
Allow concrete to cure.
In actual practice each wall was completed in a single continuous pour in one day.
Available from diy stores and ready mix concrete companies these contain soluble emulsions that form a protective film when sprayed directly onto the surface of newly poured concrete slabs or walls.
Finish the surface of the wall as desired.
If the height of the wall or column form is not considerably long pour concrete from the top of the forms.
Pour footings and wall.