Proper Installation Of Roof Drip Edge

Roof Drip Edge Ii Metal Roof Installation Roof Installation Metal Roof

Roof Drip Edge Ii Metal Roof Installation Roof Installation Metal Roof

Proper Drip Edge Installation On Asphalt Shingle Roof Roof Edge Roof Drip Edge Drip Edge

Proper Drip Edge Installation On Asphalt Shingle Roof Roof Edge Roof Drip Edge Drip Edge

How To Roof A Shed Roofing A Shed Drip Edge Installing Roof Shingles Roofing

How To Roof A Shed Roofing A Shed Drip Edge Installing Roof Shingles Roofing

T Style Drip Edge Corner Install Jpg 800 X 600 100 Drip Edge Roof Drip Edge Roof Installation

T Style Drip Edge Corner Install Jpg 800 X 600 100 Drip Edge Roof Drip Edge Roof Installation

Pin On Cool

Pin On Cool

Image Result For How To Install Drip Edge On Shed Drip Edge Roof Drip Edge Roof Edge

Image Result For How To Install Drip Edge On Shed Drip Edge Roof Drip Edge Roof Edge

Image Result For How To Install Drip Edge On Shed Drip Edge Roof Drip Edge Roof Edge

To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.

Proper installation of roof drip edge.

Align the leading bottom edge of the first piece on the gable rake with the front edge of the drip edge installed on the eave. Slide the corner tight to the fascia. Be sure to tuck the drip edge under the starter strip and felt paper. Make sure the outer edge extends over the gutter.

On the gable rake install drip edge starting at the bottom and working up. The drip edge should be nailed centered in the top surface every 8 to 10 inches. How to install drip edge flashing to a new roof. It can be done.

Use a flat pry bar and hammer to pry the nails out of the drip edge gently. The above figure shows the correct application of the drip edge. Once free slide the drip edge out and discard. Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.

The roof leg should extend a minimum of 2 back onto the roof sheathing. While the vertical leg should be placed 1 4 1 2 away from the fascia. Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge. If it doesn t pull the drip edge out slightly from under the shingles.

You may need to nail through the starter strip into the drip edge. Place a nail at one end then the other. At the rake the drip edge is installed over the underlay. Secure the drip edge with roofing cement.

How to install a drip edge. Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto. Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge. No cutting is needed for this piece.

Drip Edge With Proper Angle Drip Edge Roof Installation Roof Problems

Drip Edge With Proper Angle Drip Edge Roof Installation Roof Problems

How To Dry In A Roof Install Tar Paper When Replacing Roof Shingles Diy Roofing Roof Shingles Roof Eaves

How To Dry In A Roof Install Tar Paper When Replacing Roof Shingles Diy Roofing Roof Shingles Roof Eaves

Standing Seam Metal Roofing Installation Publications By New England Metal Roof Metal Roof Installation Metal Roof Roof Installation

Standing Seam Metal Roofing Installation Publications By New England Metal Roof Metal Roof Installation Metal Roof Roof Installation

When Putting Drip Edge On A Shed Roof What Is The Proper Placement Over And Under The Underlayment And Or Shingles Partic Drip Edge Fibreglass Roof Shed Roof

When Putting Drip Edge On A Shed Roof What Is The Proper Placement Over And Under The Underlayment And Or Shingles Partic Drip Edge Fibreglass Roof Shed Roof

Source : pinterest.com